Our Friendly and knowledgeable team will erect your building for free on the day of your delivery.
Or if not needed just let us know where you need the building left and we can just drop it off for you
We recommend having a concrete slab with a 1 high brick course on all of our buildings, with the exception of the mobile shelters
The base size will depend on the size of your building and how much space you need in front
We recommend having a slightly larger base than the building with a slight slope on the concrete to divert water away
We recommend an agricultural concrete mix rather than a normal mix as the acid in a horses urine can break down the normal concrete
Please use this only as a guide, If you need any more advice please message or call us
WE can supply free of charge a floor plan for your brickwork so that your building fits correct;y on your brickwork
We can supply a mobile shelter with skids on any ground but it must be as flat and level as possible.
Please think carefully about where you are going to site a mobile shelter due to the wind
We recommend a sheltered spot towards the edge of a field, not directly on a hill in the centre
All buildings with the exception of mobile field shelters will need planning permission, But it is best to always ask your local council for all building work
We can supply any advice needed
We can also supply any drawings needed (for a fee, please message us for a quotation)
or call us on 07849666101